Case Study: Delaware DOT Bridge Treatment
Project Details
- Location: Delaware
- Year: 2019
- Area: 4.700m²
- Product Applied: BridgeDECK Waterproofing System
- Situation: A network of bridges is suffering degradatin due to cracks in the Jersey rails and bridgedeck.
- Challenge: Waterproof the bridgedeck and jersey rails without entirely blocking traffic on the busy highway.
- Solution: A partial blocking of the highway was required to ensure proper bridgedeck application to jersey rails and bridgeDeck, waterproofing the entire bridge system and preventing futher water damage.