Case Study: Marisco Floating Dry Dock
Project Details
- Location: Honolulu, Hawaii, United States
- Year: May 2017
- Area: 3,300 m² in 26 hours.
- Product Applied: TechCrete 2500 (TechCrete System)
- Situation: Waterproof the concrete hull of a newly constructed floating dry dock (Peleke Nui), with TechCrete 2500 Waterproofing System on board a heavy lift vessel at sea in May of 2017.
- Challenge: Since the newly constructed 'floating dry dock' already had a full schedule of clients waiting to be serviced, it was imperative that the shp be removed from the water... waterproofed... and returned to operation status as quickly as possible.
- Solution: TechCrete 2500 was spray applied to the concrete hull in a record 26 hours. Allowing the vessel to return to operational status in less than a weeks time.